Can you add or take out a wall in my unit?

Walls can be added or taken out in most units. We frame and drywall new walls, take out walls you don't need, and patch the floor, ceiling and drywall where they used to be.

87 Skyway Avenue: Office fit-out mid-build: steel-stud walls for the new offices, new plank flooring already down
87 Skyway Avenue: Office fit-out mid-build: steel-stud walls for the new offices, new plank flooring already down · April 2025

Taking walls out

We take down the wall, haul away the debris, and patch the drywall and flooring where it stood. At one warehouse office we took out 4 walls. In another unit we removed walls along with old wiring and ductwork to get it ready for a new tenant.

Putting walls in

New walls are framed with steel studs, insulated if needed, drywalled and painted. At one site we built an insulated wall with a metal door to close off a lunchroom from the warehouse.

Some walls carry weight. At one building we built a new block wall to support a new shipping door.

What should I send?

The address, the unit, a simple sketch of where the wall goes or comes out, and a photo. Tell us if there are outlets, lights or sprinklers in the wall or above it.

Unedited photos from our crew's phones, dated from our invoices.

Our record

10 jobs where we did this, since 2021

Dated jobs from our invoices. No client names or prices.

  • 2026

    4570 Eastgate Parkway

    Mississauga · Jun 2026

    Demolished 4 office walls, removed debris, and patched drywall and flooring where the walls came out.

  • 2333 Millrace Court: work in progress

    2333 Millrace Court

    Mississauga · Jul 2022 – Oct 2026

    Office make-good: rebuilt three office walls, repaired drywall, replaced ceiling tiles, painted, patched the warehouse epoxy floor and steam-cleaned carpet.

  • 6150 Dixie Road, Unit 4: Showroom unit stripped to the concrete slab before the new finishes

    6150 Dixie Road, Unit 4

    Mississauga · Apr 2025 – Sep 2026

    Tenant showroom space: drywalled and braced the demising wall, replaced double doors and frame, and replaced 14 sprinkler heads.

  • 5050 Dufferin Street: finished work

    5050 Dufferin Street

    North York · Oct 2024 – Jun 2026

    Unit 119 warehouse: demolished and disposed of specific walls, electrical and HVAC ductwork as needed, plus other building materials, to ready the space for a new tenant.

  • 6535 Millcreek Drive: Parking lot light feed: the wire connections in a weatherproof box, sealed with foam and labelled with their breakers

    6535 Millcreek Drive

    Mississauga · Sep 2021 – Nov 2026

    Fit out a tenant space in Units 24–26: new kitchen and vanities, vinyl flooring, framed room, new wall opening, painted warehouse walls, LED lighting.

  • 5100 Erin Mills Parkway: Concrete steps before repair: broken nosings and crumbling treads

    5100 Erin Mills Parkway

    Mississauga · Nov 2024 – Oct 2026

    Built hoarding walls (framed, drywalled, primed; some 8–9 ft high, one with double doors) in the food court, on the 2nd floor and in several vacant units.

  • 6925 Century Avenue: Finished corridor: ceiling, lighting and exit sign

    6925 Century Avenue

    Mississauga · Aug 2023 – Sep 2026

    8th floor fit-out: corridor and demising wall, server room electrical panel, and carpet tile and paint in Suite 800.

  • 103 Brisbane Road: work in progress

    103 Brisbane Road

    North York · Jun 2025 – Feb 2026

    Supplied and installed a second new commercial shipping door with hardware and framing, built a new cinder block wall to support it, and put up temporary shoring during the work.

  • 2024

    1701 Flint Road

    North York · Mar 2024 – Apr 2024

    Renovated 3 washrooms: cut and chipped the concrete to tie in new drainage lines, and framed new walls with 2-1/2" track and studs.

  • 2022

    1 Eva Road

    Etobicoke · May 2022 – Dec 2023

    Interior: applied epoxy in hallways, repaired drywall, repaired and painted a wall, demolished a wall, and supplied and installed a shelf.

All drywall and ceiling repairs on our record →

Quick answers

Can you split one unit into two?

Yes. We build demising walls between units, drywalled and braced.

Do you build temporary walls?

Yes. We build hoarding walls to close off vacant units or work areas, some with doors.

Who moves the electrical and sprinklers?

We coordinate the electrician and sprinkler work so the wall goes in once.

Got a job like this one?

Send the address, what needs doing, and a few photos.

We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.

Start with your address or call 416-567-4870
commercial addresses since 2013
178
called us back for more work
101
had us back in more than one year
74