HOMELANDCONTRACTORS

Is it worth switching my building to LED lights?

Switching to LED is usually worth it: LED fixtures use less power and last much longer than old fluorescent tubes. They don't need ballasts, so the flickering and humming stop. Most switches happen one unit or one area at a time.

1245 Dupont Street: Open roof deck above the corridor walls, painted white, with pendant lights
1245 Dupont Street: Open roof deck above the corridor walls, painted white, with pendant lights · January 2017

Where it makes the biggest difference

Warehouses with high ceilings. Old fixtures up there are hard to reach and slow to fix. We've installed LED high bays in warehouse units and LED warehouse fixtures during a fit-out.

Offices, hallways and washrooms. We put in LED flat panels, pot lights and fixtures when a unit is being refreshed, so the work happens once.

Outside the building

Wall lights over doors and around the building. We've replaced an old wallpack with a new LED wallpack. Brighter outside lights also help a building feel safer at night.

What should I send?

The address, the unit, how high the ceiling is, and a photo of the fixtures you have now. If some lights are already out or flickering, tell us which ones.

Unedited photos from our crew's phones, dated from our invoices.

Our record

11 jobs where we did this, since 2020

Dated jobs from our invoices. No client names or prices.

  • 5750 Timberlea Boulevard: work in progress

    5750 Timberlea Boulevard

    Mississauga · Sep 2022 – Oct 2026

    Electrical: repaired an exit sign and an exterior light, capped exposed wires, and replaced a wallpack with a new LED wallpack. Installed LED high bays in Units 7 and 8.

  • 6095 Ordan Drive: Warehouse: one of three structural columns we repaired, with new steel at the base

    6095 Ordan Drive

    Mississauga · May 2024 – Jun 2026

    Installed 3D wall panels, dock plates, LED warehouse light fixtures and roller shades for two offices; caulked warehouse interior and exterior ductwork.

  • 2025

    300 Trowers Road

    Vaughan · Feb 2025 – Mar 2025

    Installed LED lighting for the office space, with an electrician supplying receptacles and data jacks.

  • 6535 Millcreek Drive: Parking lot light feed: the wire connections in a weatherproof box, sealed with foam and labelled with their breakers

    6535 Millcreek Drive

    Mississauga · Sep 2021 – Nov 2026

    Fit out a tenant space in Units 24–26: new kitchen and vanities, vinyl flooring, framed room, new wall opening, painted warehouse walls, LED lighting.

  • 1245 Dupont Street: Corridor under the open roof deck: white walls, pendant lights and the exit sign

    1245 Dupont Street

    Toronto · Aug 2020 – Oct 2026

    Replaced 5 LED pot lights, a dimmer switch and a shower pot light; supplied and installed mirrors; replaced tiles and repaired flooring.

  • 6150 Dixie Road, Unit 4: Showroom unit stripped to the concrete slab before the new finishes

    6150 Dixie Road, Unit 4

    Mississauga · Apr 2025 – Sep 2026

    Interior: LED lights and ceiling tiles, vestibule drywall, baseboard and paint, water leak cleanup and damage repairs, large debris removal.

  • 165 Commerce Valley Drive West: work in progress

    165 Commerce Valley Drive West

    Markham · Aug 2022 – Jul 2026

    Concrete repairs, P1 drywall ceiling repairs and drywall repairs; installed new LED pot lights.

  • 7575 Kimbel Street: finished work

    7575 Kimbel Street

    Mississauga · Jun 2025 – Jun 2026

    Suite 100 landlord work: new VCT or laminate flooring (about 1,477 sq ft) with vinyl baseboards, about 10 ceiling tiles replaced, LED flat panel in the office washroom.

  • 2026

    601 Magnetic Drive, Unit 15

    North York · May 2026

    Washroom refresh: removed old fixtures, vanity and vinyl tile; installed new LVP flooring, white vanity with Moen faucet, vinyl base, and LED light fixture.

  • 2024

    34 Futurity Gate

    Vaughan · Dec 2024

    Installed LED lighting as part of the same project.

  • 2024

    1701 Flint Road

    North York · Mar 2024 – Apr 2024

    Installed 3 new toilets and sinks, with the plumber modifying drainage and water lines. Electrician installed a new switch and GFI per washroom and 3 new 2x2 ft LED fixtures.

All commercial electrical repairs on our record →

Quick answers

Do you need a lift for warehouse lights?

For high ceilings, yes. We bring a scissor lift so the fixtures can be reached safely.

Can you switch just one unit?

Yes. Most of our LED work is one unit, one hallway or one washroom at a time.

Who does the wiring?

Our crew works with an electrician, then patches any ceiling or wall that had to be opened.

Got a job like this one?

Send the address, what needs doing, and a few photos.

We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.

Start with your address or call 416-567-4870
commercial addresses since 2013
178
called us back for more work
101
had us back in more than one year
74

Related questions

All 33 questions →