Bent or loose bollards get welded, re-anchored or replaced on site, then painted safety yellow. A parking stop that got knocked out of place gets pinned back down with new steel rods.

2520 Royal Windsor Drive, Unit 2510: work in progress
2520 Royal Windsor Drive, Unit 2510: work in progress · July 2025

Bollards

A bollard is the short post that keeps trucks off a door, a gas meter or a window. When one gets hit, we check the base first. At one building our mobile welder added a new steel section and base plate to a damaged bollard. Then we anchored it into the ground.

New bollards get bolted down, painted or powder coated safety yellow, and get reflective tape so drivers see them at night.

Parking stops

Snow plows and cars push concrete parking stops out of line. We drill into the asphalt, put in new steel rods, and set each stop back where it belongs. Then we paint them yellow so people don't trip on them.

What should I send?

The address, a photo of each one, and what it protects. If a truck keeps hitting the same spot, tell us. A taller bollard or a railing may be the better fix.

Unedited photos from our crew's phones, dated from our invoices.

Our record

16 jobs where we did this, since 2020

Dated jobs from our invoices. No client names or prices.

  • 6160 Kenway Drive: finished work

    6160 Kenway Drive

    Mississauga · Apr 2026 – Sep 2026

    Reinforced an existing bollard with our mobile welder: welded on an added steel section and a new steel base plate, anchored into the ground.

  • 6270 Kenway Drive: Loading dock stair after the work: steel stair and handrails sanded, primed and painted grey

    6270 Kenway Drive

    Mississauga · Feb 2026 – Oct 2026

    Repaired two damaged bollards: excavated asphalt, welded on new steel extensions, backfilled and restored the asphalt.

  • 6200 Kenway Drive: work in progress

    6200 Kenway Drive

    Mississauga · Mar 2026 – May 2026

    Reinstalled five existing concrete parking stops by pre-drilling the asphalt and installing new rebar to anchor each stop in place.

  • 2020

    271 Sterling Road

    Toronto · Aug 2020

    Replaced two bollards: cut around the old ones, removed and disposed of them, installed new metal bollards filled with cement.

  • 215 Carlingview Drive: Hydro vault: the block walls around the power cable terminations, one of the rooms we parged and painted

    215 Carlingview Drive

    Etobicoke · Jan 2021 – Nov 2026

    Replaced exterior doors and frames; repaired flashing, caulking, interlock, fences and potholes; installed bollards; power swept.

  • 3250 Bloor Street West: Elevator lobby ceiling: smooth drywall bulkhead with cove lighting

    3250 Bloor Street West

    Etobicoke · Nov 2024 – Nov 2026

    Painted the centre exterior facade wall, installed 2 new ACM facade panels, and repaired a damaged bollard and a concrete curb at a P1 exit.

  • 2 Robert Speck Parkway: Site check: measuring the corridor wall beside the bottle-filling fountain before the work

    2 Robert Speck Parkway

    Mississauga · Jun 2024 – Oct 2026

    Repaired flexible bollards and installed 2 new bollard systems; replaced 7 parking lot lights and later lamp bulbs.

  • 2026

    7810 Keele Street

    Vaughan · Oct 2026

    Painted 17 bollards safety yellow with two coats of exterior-grade metal paint.

  • 51 Esna Park Drive: work in progress

    51 Esna Park Drive

    Markham · Jul 2023 – Oct 2026

    Painted five railings, the gas cages, three bollards, and the exterior, rooftop and HVAC-area gas lines with two coats, safety yellow on gas items.

  • 2026

    6990 Creditview Road

    Mississauga · Aug 2026

    Reinforced an existing bollard by welding on an additional steel section, tied into the bollard and the embedded post.

  • 15 Bramalea Road: work in progress

    15 Bramalea Road

    Brampton · Jul 2026

    Prepared and painted the bollards next to the EV charging stations in high-visibility yellow.

  • 7575 Kimbel Street: finished work

    7575 Kimbel Street

    Mississauga · Jun 2025 – Jun 2026

    Installed two 48" safety-yellow powder-coated bollards, anchored to the ground with pre-drilled anchor bolts and mounting hardware.

All concrete and exterior repairs on our record →

Quick answers

Can a bent bollard be fixed, or does it need replacing?

If the base is solid, we can often weld on new steel and re-anchor it. If the base is broken, we replace it.

Do you add new bollards?

Yes. We install steel bollards anchored to the ground and finished in safety yellow.

Do you paint old bollards?

Yes. We sand them, paint two coats of safety yellow and add reflective tape.

Got a job like this one?

Send the address, what needs doing, and a few photos.

We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.

Start with your address or call 416-567-4870
commercial addresses since 2013
178
called us back for more work
101
had us back in more than one year
74

Related questions

All 33 questions →