HOMELANDCONTRACTORS

How do I get a vacant unit ready for the next tenant?

Clear out what the last tenant left, fix what's broken, then patch, paint and clean so it shows well. Bigger changes, like new walls or flooring, usually wait until a new tenant signs.

401 Magnetic Drive: finished work
401 Magnetic Drive: finished work · June 2026

What comes first?

Clearing the space. At one turnover we removed everything left in the warehouse, the office and outside. At another we took down walls, wiring and ductwork the next tenant didn't need.

Then repairs and paint

Patch the walls, paint the walls, doors and trim, fix doors and ceiling tiles, and check the washroom works. That's what makes a unit show well.

Flooring and fit-outs

New flooring, walls or a kitchen usually come once the new tenant's plans are known.

Unedited photos from our crew's phones, dated from our invoices.

Our record

5 jobs where we did this, since 2021

Dated jobs from our invoices. No client names or prices.

  • 2021

    2525 Meadowvale Boulevard

    Mississauga · Aug 2021 – Sep 2023

    Building turnover for a new tenant: removed and disposed of items left in the warehouse, office space and exterior.

  • 5650 Tomken Road: work in progress

    5650 Tomken Road

    Mississauga · May 2022 – Jul 2026

    Cleaned out Unit 7: removed and disposed of 6 large desks, old disconnected wires and a safe, then broom swept the unit for the next tenant.

  • 5050 Dufferin Street: finished work

    5050 Dufferin Street

    North York · Oct 2024 – Jun 2026

    Unit 119 warehouse: demolished and disposed of specific walls, electrical and HVAC ductwork as needed, plus other building materials, to ready the space for a new tenant.

  • 215 Carlingview Drive: Hydro vault: the block walls around the power cable terminations, one of the rooms we parged and painted

    215 Carlingview Drive

    Etobicoke · Jan 2021 – Nov 2026

    Replaced hot water tanks, capped a plumbing vent flush with the concrete, and renovated vacant suites, including flooring.

  • 2025

    3280 Bloor Street West

    Etobicoke · Jun 2025 – Sep 2026

    Plumbing and interior: replaced hot water tanks and toilets, reinstalled washroom partitions, replaced wall and ceiling tiles, demolished a vacant space.

All interior maintenance on our record →

Quick answers

Can you do the whole turnover?

Yes. Clean-out, repairs, paint, flooring and fit-out, with one contractor coordinating it.

Do you paint before a showing?

Yes. We've painted walls, doors, ceilings and trim to get units ready for a new tenant.

What should I send?

The unit address, photos of each room, and when you want to show it.

Got a job like this one?

Send the address, what needs doing, and a few photos.

We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.

Start with your address or call 416-567-4870
commercial addresses since 2013
178
called us back for more work
101
had us back in more than one year
74

Related questions

All 33 questions →