53 addresses · 11 cities
Commercial Doors and Glass
Doors, frames, closers and glass for storefronts, units and loading areas. Every address below is a real Homeland job, dated from our invoices.



Unedited photos from our crew's phones, dated from our invoices.
What this covers
- Door and frame replacement
- Door closers, hinges and hardware
- Storefront and entrance glass
- Shipping and overhead doors
- Board-ups and weather stripping
Jobs with photos
1245 Dupont StreetToronto · Aug 2020 – Oct 2026Plumbing, washrooms and flooring.See the job →
6535 Millcreek DriveMississauga · Sep 2021 – Nov 2026Plumbing, electrical and painting.See the job →
227 Vodden Street EastBrampton · Aug 2020 – Nov 2026Plumbing, washrooms and flooring.See the job →
6200 Dixie RoadMississauga · Mar 2021 – Nov 2026Concrete & exterior, flooring and drywall & ceilings.See the job →
215 Carlingview DriveEtobicoke · Jan 2021 – Nov 2026Plumbing, doors & glass and build-out.See the job →
5100 Erin Mills ParkwayMississauga · Nov 2024 – Oct 2026Concrete & exterior, flooring and drywall & ceilings.See the job →
Unedited photos from our crew's phones, dated from our invoices.
Work record
Dated from our invoices. The goal each time: the space ready for tenants and customers. Photos are the crew's own phone shots. Every year, every city
· 167 work orders
Washroom plumbing: unclogged toilets and urinals, replaced flushometer parts, shower cartridges, shower heads and handles, and repaired faucet sensors.
See the job →

6535 Millcreek Drive, Mississauga
· 164 work orders
Fit out a tenant space in Units 24–26: new kitchen and vanities, vinyl flooring, framed room, new wall opening, painted warehouse walls, LED lighting.
See the job →
227 Vodden Street East, Brampton
Planet Fitness Brampton (Centennial Mall)
· 111 work orders
Washroom plumbing: cleared clogged toilets and urinals, replaced flushometer diaphragms, replaced sink traps and re-secured sinks to the countertop.
See the job →

· 92 work orders
Refreshed common areas: new carpet tile and base, painted walls, doors and frames, replaced ceiling tiles, exit signs and emergency lights, repainted stairwells, refinished wood handrails.
See the job →

215 Carlingview Drive, Etobicoke
· 85 work orders
Welded and repaired metal staircases, guardrails and a sprinkler room door; repaired and adjusted exterior metal gates.
See the job →

5100 Erin Mills Parkway, Mississauga
· 63 work orders
Built hoarding walls (framed, drywalled, primed; some 8–9 ft high, one with double doors) in the food court, on the 2nd floor and in several vacant units.
See the job →

3250 Bloor Street West, Etobicoke
· 61 work orders
Painted the centre exterior facade wall, installed 2 new ACM facade panels, and repaired a damaged bollard and a concrete curb at a P1 exit.
See the job →
6925 Century Avenue, Mississauga
· 61 work orders
Removed two rooftop steel sign-support structures by crane, capped the 12 post openings, and patched the roof membrane at each.
See the job →





48 Galaxy Boulevard, Etobicoke
· 53 work orders
Concrete: saw-cut and ground trip hazards between slabs, repaired and painted safety-yellow curbs, lowered curbs, and repaired walkways.
See the job →

2333 Millrace Court, Mississauga
· 27 work orders
Warehouse strip-out: removed about 133 ft of 20 ft racking, wood wall paneling, signage, track lighting, power poles and the air compressor with piping.
See the job →

3115 Harvester Road, Burlington
· 25 work orders
Painted 3 doors and frames, repaired and painted an office wall, and did line painting.
See the job →
6150 Dixie Road, Unit 4, Mississauga
· 22 work orders
Tenant showroom space: drywalled and braced the demising wall, replaced double doors and frame, and replaced 14 sprinkler heads.
See the job →

1100 Burloak Drive, Burlington
· 21 work orders
Installed 12 new floor tiles in the 5th floor men's washroom and removed and disposed of broken tiles.
See the job →

· 21 work orders
Saw-cut and removed damaged concrete, then installed new self-leveling concrete to restore a smooth surface.
See the job →

5750 Timberlea Boulevard, Mississauga
· 18 work orders
Electrical: repaired an exit sign and an exterior light, capped exposed wires, and replaced a wallpack with a new LED wallpack. Installed LED high bays in Units 7 and 8.
See the job →

· 16 work orders
We saw-cut the perimeter of damaged concrete, removed and disposed of it, and installed new self-leveling concrete for a smooth, even surface.
See the job →
· 14 work orders
Stucco: replaced stucco above the storefront, at the front entrance and on the back entrance ceiling; repaired the west entrance and vertical stucco.
See the job →

1050 Finch Avenue West, North York
· 11 work orders
Suite 202 build-out: demolition, framing, electrical rough-in, HVAC, sprinklers, doors and frames.
See the job →



345 King Street West, Kitchener
· 8 work orders
Suite 200 office fit-out: framing, drywall and acoustics, millwork and cabinetry, wood and glass doors with hardware, glazing, flooring, paint.
See the job →

5640 Tomken Road, Unit 2, Mississauga
· 8 work orders
Unit 1 flooring: removed the old carpet and vinyl tile throughout, then installed new carpet tiles in the office area and LVT flooring in the washrooms.
See the job →
· 7 work orders
Replaced an elongated toilet with a new seat, wax gasket, mounting bolts and supply line, and tested it.
See the job →

· 7 work orders
Boarded up the Unit 4 window opening after a vehicle hit the building: same-night plywood, then framing, insulation and exterior sealing over two visits.
See the job →

650 Briar Hill Avenue, Toronto
· 7 work orders
Replaced a metal air conditioning casing set in the brick with a new same-size casing, and caulked around it for a water- and air-tight seal.
See the job →

· 6 work orders
Installed 4 ten-foot safety railings on the asphalt with mounting brackets, one protecting each window well, plus 2 steel bollards (42" tall) at the ends, powder coated safety yellow.
See the job →

· 5 work orders
Replaced a door and frame at one unit and repaired door frames at two units.
See the job →

· 5 work orders
Installed a new shipping door with all new components after removing and disposing of the metal sheet that had been acting as a door, and prepped the opening for the new door and equipment.
See the job →

6270 Kenway Drive, Mississauga
· 4 work orders
Repaired two damaged bollards: excavated asphalt, welded on new steel extensions, backfilled and restored the asphalt.
See the job →

20 Adelaide Street East, Toronto
· 4 work orders
Built out a property management office suite: demolition, gypsum board walls, mechanical, electrical and sprinklers.
See the job →

770 Birchmount Road, Scarborough
· 3 work orders
Installed new weather stripping at the bottom of two front entrance doors.
See the job →

2185 Lawrence Avenue East, Scarborough
· 2 work orders
Supplied and installed hollow metal doors with hardware, 17 in one phase and 5 in a follow-up phase.
See the job →
· 1 work order
Replaced a broken colored glass panel in an upper window opening, made to match the existing colour and size, with new glazing seals and weatherstripping.
See the job →

354 Humberline Drive, Etobicoke
· 1 work order
Removed and disposed of the broken glass and debris from the opening, and cleaned the frame.
See the job →

150 Courtneypark Drive West, Unit 1, Mississauga
· 1 work order
Painted 2 doors with 2 coats, including sanding and surface prep.
See the job →

· 1 work order
Caulked windows in Unit 2: cut out and disposed of damaged caulking and installed new caulking where needed, matched to the existing colour.
See the job →



3280 Bloor Street West, Etobicoke
TELUS Health Care Centre (Toronto Bloor)
· 36 work orders
Concrete repairs: parking garage entrance, accessibility ramp base at Entrance E, foundation wall, and Centre Tower P1; also repaired P4 cement ceiling.
See the job →15 Marmac Drive, Unit 1, Etobicoke
· 21 work orders
Concrete curb repairs: patched cracked and loose curb sections, parged curbs, repaired curb corners, and did concrete pad work.
See the job →· 16 work orders
Exterior: repaired potholes and asphalt, lowered a concrete curb, relaid interlock, repaired a fence, and did stucco and cold asphalt work.
See the job →1 Aberfoyle Crescent, Etobicoke
· 10 work orders
Replaced a jacuzzi faucet, installed two access panels at the shut-off valve, and removed and reinstalled the jacuzzi tile.
See the job →5420 North Service Road, Burlington
· 9 work orders
Sealed an opening in a 5th-floor men's washroom by building a box and anchoring it to the concrete floor.
See the job →· 7 work orders
Painted the roof parapet walls with rust-proof paint, painted the fire escape with 2 coats, and scraped rust off and repainted the front door at 401-A.
See the job →1023 Greaves Avenue, Mississauga
· 6 work orders
Replaced the old sump pump and added a second, battery-powered pump.
See the job →5770 Timberlea Boulevard, Mississauga
· 6 work orders
Repaired the two exterior garbage bin gates: removed them, reinstalled the hinges correctly and supported the weight. Added anchors on each side and the back of the building sign.
See the job →· 4 work orders
Repaired a sinkhole: saw-cut a 30-inch by 30-inch area, removed the asphalt, installed a concrete base and topped it with 4 inches of hot-mix asphalt.
See the job →5780 Timberlea Boulevard, Mississauga
· 4 work orders
Painted two second-floor access doors, including surface prep, and replaced the weather stripping on one door.
See the job →· 2 work orders
Responded to an emergency call and boarded up the broken front entrance door opening with plywood after a break-in.
See the job →110 Scotia Court, Whitby
· 1 work order
Cut out a rusted part of a metal door frame and welded in new metal.
75 & 85 Chambers Drive, Ajax
· 1 work order
Removed the weather stripping on both sides of each loading dock at units 5 and 6, 75 Chambers Drive, and applied caulking to the dock openings.
See the job →2275 Speakman Drive, Mississauga
· 1 work order
Replaced a door and frame: removed and disposed of the old assembly, prepared the opening, and installed a new door and frame.
See the job →4570 Eastgate Parkway, Mississauga
I-XL Building Products (Toronto Design Centre)
· 1 work order
Demolished 4 office walls, removed debris, and patched drywall and flooring where the walls came out.
See the job →5170 Timberlea Boulevard, Mississauga
· 1 work order
Replaced the weatherstripping on two exterior doors to improve the seal.
See the job →651 Briar Hill Avenue, Toronto
· 1 work order
Replaced 2 sets of mirrored sliding doors in a unit, removing and disposing of the old damaged doors.
See the job →
Questions
Do you do commercial door and glass work?
Yes. Our record shows door and glass work at 53 commercial addresses since 2020, each one dated from our invoices.
What does a door and glass job look like?
6535 Millcreek Drive (Sep 2021 – Nov 2026): Fit out a tenant space in Units 24–26: new kitchen and vanities, vinyl flooring, framed room, new wall opening, painted warehouse walls, LED lighting. See the job →
Questions property managers ask
When does my building need new caulking?30 of our jobs
Why won't my building's door close properly?27 of our jobs
Who replaces broken glass in a storefront or office window?5 of our jobs
How do I stop water and drafts at my loading dock?4 of our jobs
Can a rusty steel door be fixed, or does it need replacing?6 of our jobs
Got a job like this one?
Send the address, what needs doing, and a few photos.
We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.
- commercial addresses since 2013
- 178
- called us back for more work
- 101
- had us back in more than one year
- 74