89 Skyway, Etobicoke

What we did

  • Saw-cut and removed damaged concrete, then installed new self-leveling concrete to restore a smooth surface.
  • Filled and repaired stucco holes around the building perimeter. Installed about 45 linear feet of exterior caulking at Unit 100.
  • Unit 100 fit-out: demised electrical circuits, relocated 2 doors, replaced kitchen countertop, sink and faucet.
  • Installed a trap guard in a 2nd floor men's washroom floor drain for odour control. Did pest control work at Unit 100.
89 Skyway: Entrance vestibule opened up: steel studs and insulation exposed before new drywall
Entrance vestibule opened up: steel studs and insulation exposed before new drywall · June 2026
89 Skyway: Unit 100 cleared for the fit-out: ceiling tiles out, wiring down for relocation
Unit 100 cleared for the fit-out: ceiling tiles out, wiring down for relocation · April 2026

Unedited photos from our crew's phones, dated from our invoices.

Questions property managers ask

What if something isn't right after the job?

We stand behind our work. If something isn't right, we come back and make it right.

Is the walkthrough free?

Yes. We walk the site first, so the price is based on what's actually there.

Got a job like this one?

Send the address, what needs doing, and a few photos.

We get back to you within 24 hours, walk the site, give you a fair written price before we start, and stand behind the work after we leave.

Start with your address or call 416-567-4870
commercial addresses since 2013
178
called us back for more work
101
had us back in more than one year
74